At Cummins Midrange Engine Plant - #1 Volume Engine Plant in the US
New product introduction:
Managed new product introduction packaging $850K AOP , design to meet each product release phase.
Packaging:
• Cost reduction over $600K through environmental, operator ergonomic, safety improvement, inventory lower MOQ, reduced lineside downtime activities.
Inventory management:
• Improved raw material inventory accuracy from 72% to above 90% on average
• Led IATF16949 certification for plant material department.
• Led new warehouse setup for plant engine banking project.
Material planning:
• Interim material planning manager (4 months) during manager’s hiring and transition:
Material operation:
Backup for linestocking, receiving, shipping manager during weekend or absence, managing 20+ union employees